The Muegge Road Rehabilitation project is intended to replace the sections of pavement that have badly deteriorated. This project will remove and replace the damaged slabs of pavement. The existing 4-foot sidewalk on the west side will be replaced with a 5-foot sidewalk and new ADA ramps. The shared use path on the east side of Muegge will be extended from the shopping center to Old Muegge with a new 10-foot wide shared use path. The signals at Old Muegge will be improved with pedestrian push buttons. This project will accomplish goals from the City’s Long Range Transportation plan, the Long Range ADA Transition and Sidewalk Plan and the City’s Bicycle and Pedestrian Master Plan.