The Duchesne Dr. Reconstruction project will be a full depth pavement replacement between West Clay and Droste, completing the triangle. It will add an 8 foot wide shared use path on the east side to encourage pedestrians in the area. The ADA ramps and remaining sidewalks will also be improved with this project. There is a large monument sign at the southwest quadrant of Raymond and Duchesne that obscures sight distance that will be relocated as part of this project and we will further improve safety by installing LED stop signs at that intersection. The project will also address poor drainage in the area caused by the existing flat grades and inadequate storm facilities. We are currently in design for this project with a pan to go to construction in 2025.