Construction Projects

  1. West Clay Reconstruction

    This project will reconstruct the pavement and connect sidewalk sections through the corridor.

    Link to page
  2. 94 Water Tower

    The City’s Water Master Plan indicated insufficient elevated storage and recommended a new water tower to provide sufficient capacity to serve existing and future developments.

    Link to page
  3. Kingshighway Signalization Improvement Project

    This project will improve traffic flow along Kingshighway from Watson to Elm Street by changing the roadway to a 3-lane section and upgrading the signals.

    Link to page
  4. Riverview Lift Station

    The existing Riverview Lift Station equipment is outdated and subject to flooding. This project will make a wide range of improvements and updates.

    Link to page
  5. Fifth Street Gateway Project

    The City of St. Charles is planning roadway and streetscape improvements for Fifth Street from I-70 to First Capitol.

    Link to page
  6. 2016 Annual Asphalt

    2016 Annual Asphalt

    Link to page
  7. Lindenwood Avenue Culvert Replacement

    This culvert was identified as a high priority replacement after an inspection in 2013. The project will replace a deteriorated 6' diameter CMP.

    Link to page
  8. Zumbehl and Friedens Pavement Rehabilitation

    This project will encompass a wide variety of pavement and sidewalk repairs to Veterans Memorial and Arena Parkway

    Link to page
  9. Exposed Sanitary Sewer Pipes in Creek Bank

    The project's intent is to protect/move the exposed sanitary sewer mains that are located within a creek.

    Link to page
  10. 30-35 Terrie Storm Sewer

    This project intends to install 725' of new storm sewer and inlets along the rear property lines to tie into existing storm sewer lines.

    Link to page
  11. Boschert Creek Sanitary Sewer Replacement

    The project is intended to replace approximately 460' of 8" sanitary mains to create positive drainage and seal three manholes.

    Link to page
  12. Huster Road Water Well

    To accommodate a growing population, the City of St. Charles will design and construct a new water well to increase raw water supply to Elm Point Water Treatment Plan by two million gallons per day.

    Link to page
  13. I-70 at 5th Street & Fairgrounds Improvement

    I-70 at 5th Street & Fairgrounds Improvement

    Link to page
  14. Pralle Lane 38FF Water Upgrade

    This waterline replacement/rehab project was identified as a High Priority Fire Flow Project (38FF) in the 2011 Water Master Plan. This project will construct approximately 1,610 feet of new 12” main.