Downtown Area Water Distribution Control Study

Project Description


Complete inventory of water valve operations in the downtown area and develop operation asset management procedures along with CIP projects for distribution system control and isolation within the downtown area (east of Fifth Street).

Project Location


From Clark Street to Reservoir Street

Contact Information


Todd Hughes
Project Manager
636.949.3237

Current Project Activities


  • The City has collaborated with Lochmueller Group and M.E. Simpson Co, Inc to conduct watermain shutoff testing 
    • Testing will occur on 9/6/2016 - 9/9/2016 & 9/12/2016 - 9/16/2016
  • The City is currently design stage of this project
  • A map has been published showing the area in which the project will cover
  • Final segment analysis is underway
  • Draft report due in December

Project Timeline

downtown timeline

Project Progress

downtown progress
downtown budget

Project Risks

Downtown Area Water Distribution Control Study
If you have any questions regarding the project risks, please contact the project manager at the Public Works office, 636-949-3237