100 Block Howard Storm Sewer

Project Description
The City's Water Pollution Control (WPC) division has located a manhole/cistern just north of Pine St. that does not drain properly. Attempts to use the Vactor truck to pump down the line have failed. Reconstructing the main in this area will allow for a gravity flow system that does not back up. Additionally, WPC has noticed a lot of flow seeping into the manholes upstream. Sealing the manhole will extend the life of the structure and reuse infiltration. The project is intended to replace approximately 460 feet of 8 inch diameter sanitary main and manholes to create positive drainage and seal three manholes.

Project Location
Along Boschert Creek from Pine Street to Easton Place Connection.

Contact Information
Steve Dansberry
Project Manager
636-949-3237

Current Project Activities
  • Right-Of-Way phase is complete.
  • Property acquisition were completed in Fall 2014.
  • Construction began in Spring 2016. 
  • Construction was completed in Spring 2016. 

Project Timeline

100 block howard timeline

Project Progress

100 Block Howard Storm Sewer Project Progress

Project Budget

100 Block Howard Storm Sewer Project Budget